COCA-COLA PROJECT DETAILS
Industry
Manufacture
Location
Calgary, Alberta
Objective
Finished the installation of a 13-floor, 3-module-high storage system, reaching approximately 40 meters in height. This was a modular construction project in which we initially constructed the frames, which were subsequently utilized to assemble the modules.
System Solutions
- 6ft thick concrete foundation, along with anchor boxes embedded in the concrete for stability.
- Extensive grout work
Project Scope
- Installation
Environment
- Ambient
- Approximately 46,000 sq. ft.Â
Overview
Cam Industrial developed a customized storage solution for Coke in Calgary’s Airport zone, navigating strict height restrictions and securing permits from both YYC and the City of Calgary. Spanning 10 months, the complex build featured a 6-foot-thick concrete foundation to support and anchor the structure. The 35-meter-high system—comprising 13 levels and 3 modules—showcased the scale and precision of the engineering involved. Three dedicated teams used high cranes to assemble the modules and install the racking.
In-House Services
- Consultations
- Design & Engineering
- Installations
- Preventative Maintenance
- Inspections & Repairs
- Permitting
Your Start-To-Finish Solution Provider
Over 40 years of providing reliable and efficient turnkey solutions across Canada. Contact us today.
- Call: 1-800-772-3213
- Email: inquiries@camindustrial.net
Back to Projects